VDOT road work scheduled this week
|
|
The Virginia Department of Transportation reports the following road work this week:
SHENANDOAH COUNTY
Interstate 81
* Mile marker 263.9 to 298, northbound and southbound - Debris removal, brush cutting and clean guardrail. Monday to Friday, 8:30 a.m. to 4:30 p.m.
* Mile marker 265 to 275, northbound and southbound - Bridge repairs on various structures. Single lane closures from 8 p.m. to 7 a.m. Monday to Friday morning.
Primary Roads
* Route 11 (Old Valley Pike) - Safety improvement project at 5628 Main St. in Mount Jackson. Work zone contains lane diversion.
* Route 211 - Utility tree trimming. Flagger traffic control during daylight hours, Monday to Friday.
Secondary Roads
* Route 623 - Back Road poject. Construction of new alignment Route 638 and Route 623. Daily blasting operations will occur. Traffic controlled by temporary traffic signals, Monday to Friday, 7 a.m. to 7 p.m. Estimated completion is fall 2012.
* Route 720 (Wissler Road) - Bridge repairs at Meems Bottom Bridge located 0.3 mile west of Route 11. Road closed to through traffic from 9 a.m. to 1 p.m. Monday.
* Various roads - Utility tree trimming. Flagger traffic control during daylight hours, Monday to Friday.
* Various roads - Patching, mowing and brush cutting.
FREDERICK COUNTY
Interstate 81
* Mile marker 300 to 324, northbound and southbound - Debris removal and sign work. Monday to Friday, 8:30 a.m. to 4:30 p.m.
* Mile marker 313 to 315, northbound and southbound - In conjunction with the Route 657/Senseny Road Bridge deck replacement work. Shoulder closures and intermittent nighttime lane closures beginning Feb. 20 for installation of barrier for shoulder closures. Estimated completion is mid-August.
Primary Roads
* Route 7, eastbound and westbound - Close existing crossover at Route 656 (Morgan's Mill Road). Left lane closed, Monday to Friday, 9 a.m. to 5 p.m. Estimated completion is Aug. 4.
* Route 11 - Paving from West Virginia state line to Route1620. Traffic controlled by flaggers and pilot trucks, Monday to Saturday, 8 p.m. to 6 a.m. Estimated completion is Aug. 3.
* Route 37 - Paving on ramps at Route 50, Route 622, Route11. Lane closures from 9 p.m. to 5 a.m., Monday to Friday. Estimated completion is August 30, 2012.
Secondary Roads
* Route 657 (Senseny Road, Winchester) - Deck replacement work on bridge over I-81 from Millwood Pike (Route 522/50/17) and Berryville Pike (Route 7). Single-lane traffic with 10.5-foot width restriction, controlled by temporary signals. Estimated completion is mid-August.
* Various roads - Utility tree trimming. Flagger traffic control during daylight hours, Monday to Friday.
* Various roads - Paving operations. Flagger traffic control, 7 a.m. to 5 p.m., Monday to Friday. Estimated completion is October 1, 2012.
* Various road - Mowing, scraping and pipe replacement.
WARREN COUNTY
Interstate 66
* Mile marker 1 to 13, eastbound and westbound - Debris removal and drain cleaning, Monday to Friday, 8:30 a.m. to 4:30 p.m.
Interstate 81
* Mile marker 298 to 300, northbound and southbound - Debris removal, ramp cleaning at exits 302 and 307, and drain cleaning. Monday to Friday, 8:30 a.m. to 4:30 p.m.
Primary Roads
* Route 522 - Paving from Front Royal Town Limits to Rappahannock County Line, paving operations, Monday through Friday, 8 p.m. to 8 a.m. Traffic to be controlled by flaggers and pilot vehicle. Estimated completion is Aug. 3.
* Route 340 - Paving from Front Royal Town Limits to Route 619, north and south, Monday through Friday, 7 p.m. to 8 a.m. Alternating lane closures.
Secondary Roads
* Route 681 - Recreational access to Eastham Park. Pavement widening on Luray Avenue. Lane and shoulder closures, daily, 7 a.m. to 5 p.m. Estimated completion is Sept. 28.
* Various roads - Utility tree trimming. Flagger traffic control during daylight hours, Monday to Friday.
* Various roads - Patching.
CLARKE COUNTY
Primary Roads
* Route 7, eastbound and westbound - Install turn lane extensions at various crossovers from Route 635 to Route 660. Left lane closed, Monday to Friday, 9 a.m. to 5 p.m. Estimated completion is Aug. 4.
* Route 7 Business (West Main Street) - Mosby Boulevard Project. Construction of Route 636/Mosby Boulevard extension and round about. Flagger traffic control. Estimated completion is May 2013.
Secondary Roads
* Various roads - Paving operations. Flagger traffic control, Monday to Friday, 7 a.m. to 5p.m. Estimated completion is October 1, 2012.
* Various roads - Mowing and patching on various roads.

Leave a comment
Comments
Comments that are posted on nvdaily.com represent the opinion of the commenter and not the Northern Virginia Daily/nvdaily.com. If you feel that a comment is objectionable, please click on the Report Abuse link above and in your e-mail to us include the comment. We will review the reported comment and make a decision on deleting it if we feel that it contains inappropriate content.