nvdaily.com link to home page
Google
Web nvdaily.com
Home | Archive | Weather | Traffic
Subscribe | Guide to the Daily


Traffic

    Traffic News & Maps     Blog: Valley 9-1-1     Gas Prices Map & Charts

Monday, April 28, 2008

On the roads

Interstate 81: Right shoulder closing at mile marker 279 southbound for road work in Shenandoah County. Nighttime guardrail work. Ramp work at Exits 307 and 315 in Frederick County.

Interstate 66: Bridge work with possible shoulder closings westbound, east of Exit 6 at U.S. 340-522. Work is weekdays from 7 a.m. to 7 p.m.

U.S. 340-522: Construction at North Fork bridge. Speed limit is reduced to 25 mph.

U.S. 522: Pipe rehabilitation two miles south of Va. 604. Single lane closings Monday to Friday from 7 a.m. to 7 p.m.

U.S. 340: New traffic pattern with traffic using new bridge. Speed limit reduced to 45 mph. There will be periodic lane closings between 8 a.m. and 4:30 p.m. Monday to Friday with flagmen controlling traffic. Shoulders will be closed throughout the work zone for the remainder of project. Also, vegetation management from the Page County line to the town of Front Royal.

Va. 675 (Shenandoah): Road closed for removal of temporary bridge, west of Va. 42 at Va. 623 in Columbia Furnace area. New bridge construction beginning in summer. Detour will be put in place.

Va. 277 (Frederick): Signal installation at Va. 1085. Intermittent lane closings.

South Loudoun Street (Winchester): New traffic pattern will remain until late spring. Temporary pavement will be used at the intersection of South Loudoun Street and Weems Lane. The South Loudoun Street project involves widening the road with a box culvert extension near Featherbed Lane. Curb, gutter and sidewalk will be added south of Weems Lane to south of Featherbed Lane.

Va. 637 (Warren): Patching.

Va. 7 (Clarke): Construction of turn lane in westbound lane at Va. 679 east and Va. 603, and in eastbound lane at Va. 604 south. Also, cleaning concrete ditches.

Va. 643 (Clarke): Pipe rehabilitation. Lane closings north of Va. 7. Work is Monday to Friday from 7 a.m. to 7 p.m.

Primary road maintenance: Guardrail work in Shenandoah County. Guardrail work and vegetation management near guardrails and mobile work zone for line painting in Frederick County.

Secondary road maintenance: Mobile work zone for line painting in Frederick County. Patching in Warren County. Patching hard surfaced roads and preparing non-hard surfaced roads for dust control in Clarke County.





 

High school news

Central | Clarke | Handley | James Wood | Millbrook
Sherando | Skyline | Stonewall Jackson
Strasburg | Warren










News | Sports | Business | Lifestyle | Obituaries | Opinion | Multimedia| Entertainment | Homes | Classified
Guide to the Daily: Advertise | Circulation | Contact Us | Commercial Printing | NIE | Place a Classified | Privacy Policy | Subscribe

Copyright © The Northern Virginia Daily | nvdaily.com | 152 N. Holliday St., Strasburg, Va. 22657 | (800) 296-5137

nvdaily.com
The best small daily newspaper in Virginia
          Real Cities Network